Management & responsibility
Quality policy, certification scope, organisation chart and responsibility matrix, appointments of the Responsible Person, Technical Manager and Complaints Manager, financial probity and process continuity.
PAS 2030:2023 sets out how installers of energy efficiency measures in existing homes must plan, install, commission and hand over their work. QMS Gurus gives you every policy, procedure, form and record your quality system needs, branded with your company details and ready to complete and sign online.
£595 + VAT · Includes the PAS 2035 Retrofit Coordinator library
Quality policy, certification scope, organisation chart and responsibility matrix, appointments of the Responsible Person, Technical Manager and Complaints Manager, financial probity and process continuity.
Document control, records retention, master document register, change control and data protection procedures.
Customer contract procedure and template, customer engagement and vulnerable occupant procedures.
Training and competence procedure, role competency matrix, training records, competence sign-off, CPD log, toolbox talks and supervision records.
Subcontractor management, approval, competence and performance records, approved materials and manufacturer certification register, and Retrofit Assessor / Coordinator agreements.
Retrofit design receipt and validation, pre-installation building inspection (PIBI) procedure and forms for 27 measures, from cavity wall insulation to heat pumps and solar PV.
Method statements, site readiness checks, risk assessments, installation control, photographic evidence, inspection and test, commissioning and customer handover records.
Non-conformance and NCR forms, root cause analysis, corrective and preventative action logs, internal audit, management review, complaints and TrustMark compliance.
Every document gets your logo and company details, an online form, share links, e-signatures in order and Word / PDF downloads.
Yes. Every PAS 2030 subscription includes the PAS 2035 Retrofit Coordinator library at no extra cost.
Yes. There is a pre-installation building inspection form for each of 27 measures, each with Yes / No / N/A answers that become an online form.